[2024] Get Top-Rated HP HPE0-S60 Exam Dumps Now
Passing Key To Getting HPE0-S60 Certified Exam Engine PDF
HPE0-S60 exam is an excellent opportunity for IT professionals to demonstrate their expertise in HPE compute solutions. Passing the exam can help professionals advance their careers and increase their earning potential. Delta - HPE Compute Solutions certification is recognized globally and is a valuable addition to any IT professional's resume.
NEW QUESTION # 47
Your customer uses HPE OneView to manage their HPE Synergy environment. They plan to use it to manage a new set equipment that includes.
- 20 HPE ProLiant DL365 Gen10 Plus servers
- 20 HPE ProLiant DL380 Gen10 Plus servers
- 5 HPE Primera 650
- 5 HPE MSA 2062 Storage Array
Which statements about now OneView will work with this new equipment are true? (Select two)
- A. HPE ProLiant DL365 Gen10 Plus servers are not supported in HPE OneView
- B. HPE Primera 650 can be managed using HPE OneView.
- C. HPE MSA 2062 Storage Array is not supported in HPE OneView
- D. HPE OneView replaces array management tools for both types of array
- E. HPE ProLiant DL380 Gen10 Plus servers have an HPE OneView license included
Answer: E
NEW QUESTION # 48
An administrator tries to open iLO interlace from HPE OneView Instead of being automatically logged in a login prompt displays Where should you start the troubleshooting process?
- A. At HPE OneView Interface to verify whether the server is In the maintenance mode
- B. At the iLO interface to verify whether the SSO certificate is removed from an iLO.
- C. At the iLO interface to verify whether the ILO Advanced license is properly applied
- D. At HPE OneView Interface to verify whether the iLO processor is disabled
Answer: C
NEW QUESTION # 49
Match each HPE Synergy logical component with the definition.
Answer:
Explanation:
NEW QUESTION # 50
You need to setup HPE Synergy frames after hardware components are discovered within HPE OneView.
Put the steps to achieve this goal into the coned order in the answer area on the right.
Answer:
Explanation:
1 - Create a logical interconnect group with uplink sets.
2 - Create a logical enciosure.
3 - Create an enciosure group.
4 - Create server profile templates and server profiles.
5 - Define all required networks.
NEW QUESTION # 51
Your customer plans to use HPE OneView for VMware vCenter Server to deploy ESXi systems. They created a server profile template that they want to use in HPE OneView.
Put the steps required to configure HPE OneView for VMware vCenter Server on the left into their correct order on the right.
Answer:
Explanation:
NEW QUESTION # 52
A logical interconnect group can span on multiple HPE Synergy frames for which interconnect type?
- A. HPE virtual Connect SE 32 Gb FC Module for Synergy
- B. HPE Virtual Connect SE 100 Gb F32 Module tor Synergy
- C. HPE Synergy 12 Gb SAS Connection Module
- D. Brocade 32GB Fibre Channel Switch Module for HPE Synergy
Answer: B
NEW QUESTION # 53
Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster You are preparing a proposal with the following components:
- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules
- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy
- an appropriate number of the vSphere Standard licenses for each compute node
- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options Which statement about this proposal is true?
- A. vSphere Standard licenses should be replaced with Enterprise Pius licenses to enable requested features
- B. 20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drive.
- C. One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM
- D. 2 additional HPE Synergy 480 Gen10 Plus compute modules can be added to this setup
Answer: A
NEW QUESTION # 54
Refer to the exhibit.
Which statement about this logical interconnect group is true?
- A. interconnect modules are installed in interconnect bays 1 and 4
- B. For an uplink set, ports from different modules can be selected
- C. Both modules are located in different frames for redundancy
- D. An additional license is required to change the enclosure count
Answer: D
NEW QUESTION # 55
Refer to the exhibit.
Which statement about this logical interconnect group is true?
- A. The master modules are located in the interconnect bays 2 and 5
- B. To use interconnect bay set 3, all compute nodes must be half-height
- C. Both master modules are located in the same HPE S ynergy frame
- D. For the given downlink speed, the maximum number of frames is reached
Answer: C
NEW QUESTION # 56
Your customer added a new Ethernet network in HPE Oneview mat is used to manage their HPE Synergy platform.
When the customer tries to connect one of the compute nodes to this network through the server profile, this network is not available.
What must be done to fix this issue?
- A. Check the Logical Enclosure settings and verify if the maximum number of networks allowed for this LE is reached.
- B. To make this network available to use in the server profile, the customer must enable the Smart Link feature within network definition.
- C. Check within the server profile which server hardware is used and perform the Refresh operation on this compute node to get the latest adapter information.
- D. The newly created network must be added to the uplink set within the LIG, and Logical interconnect configuration must be updated from the LIG.
Answer: D
NEW QUESTION # 57
Your customer has 6 logical enclosures spanning 18 HPE Synergy frames. The customer needs to add one more logical enclosure based on 5 HPE Synergy frames How will this change impact the customer environment?
- A. The customer can add a new logical enclosure to an existing setup once all required licenses are added lo HPE OneView and associated with the new frames.
- B. The customer can add a new logical enclosure to the existing setup because the maximum number of logical enclosures in a single management ring is not reached.
- C. The customer has to expand the management ring capacity either by adding HPE Composer 2 modules or adding memory to reach 128GB per module.
- D. The customer has to create a new management ring for new logical enclosure because the maximum number of frames m a single management ring is reached.
Answer: B
NEW QUESTION # 58
Your customer has the following HPE Synergy setup
- 3 HPE Synergy 12000 Frames
- 4 HPE Virtual Connect SE 100 Gb F32 Modules
- 2 HPE Synergy 50 GO Interconnect Link Modules
- 36 HPE Synergy 480 Gen10 Plus compute modules
- 2 HPE Composer 2 modules
Which statement about this setup is true?
- A. To manage all frames, the customer must buy two additional HPE Composer 2 modules
- B. To use all compute nodes, the customer must create at least two logical enclosures
- C. The customer can add one D3940 storage Module to each of the frames
- D. The customer must buy 36 HPE OneView Advanced licenses to manage compute modules
Answer: D
NEW QUESTION # 59
Your customer reports mat an external FC boot volume for Windows server is visible four times in the Disk Management 1 online and 3 offline.
What should you do to resolve this issue?
- A. Remove the offline disks using Windows Disk Management
- B. Remove the offline disks using array management tools
- C. Disable deduplication for this volume at the array level
- D. Install and configure MPIO on me Windows system
Answer: D
NEW QUESTION # 60
Match HPE SimpliVity team with the definition.
Answer:
Explanation:
NEW QUESTION # 61
Click the option that will allow you to change the ESXI image used In an OS Deployment Plan.
Answer:
Explanation:
NEW QUESTION # 62
Your customer plans to deploy VMware ESXi 7 0 U2 and they are looking for a hardware platform mat wilt allow them to use up to 24 TB of physical memory.
Which HPE compute system meets this customer's requirements?
- A. HPE ProLiant DL560 Gen10
- B. HPE ProLiant DL380 Gen 10 Plus
- C. HPE Superdome Flex 280
- D. HPE Synergy 480 Gen10 Plus
Answer: B
NEW QUESTION # 63
Your customer is implementing an HPE Synergy solution based on three frames.
Click each of the ports that can be used to connect satellite modules.
Answer:
Explanation:
NEW QUESTION # 64
Your customer plans to use HPE Primera to boot HPE Synergy compute nodes. They currently have two HPE Virtual Connect SE 100Gb F32 Module for Synergy modules installed in the frame. The customer wants to use FC as a storage access protocol What must be done to complete this task?
- A. Add FC upgrade licenses in HPE OneView that will enable FC connectivity for the modules
- B. Enter both modules into a maintenance mode, then enable FC connectivity through CLI
- C. Enable FC primary and secondary boot on the modules through the HPE OneView interface
- D. FC connectivity on the modules should be enabled through the service console by disabling FCoE.
Answer: D
NEW QUESTION # 65
......
HP HPE0-S60 (Delta – HPE Compute Solutions) exam is designed for IT professionals who want to validate their knowledge and skills related to HPE compute solutions. Delta - HPE Compute Solutions certification exam is meant for individuals who already hold an HPE ATP – Server Solutions V3 or HPE ATP – Data Center Solutions V1 certification and want to upgrade their skills to the latest HPE compute solutions. HPE0-S60 exam has been designed to test the candidate’s knowledge and understanding of HPE compute solutions, including c-Class BladeSystem, HPE ProLiant Gen10, HPE Synergy, and HPE Apollo Systems.
HPE0-S60 exam questions for practice in 2024 Updated 82 Questions: https://freedumps.torrentvalid.com/HPE0-S60-valid-braindumps-torrent.html